Guidelines: Test Plan

Test Plan The test plan contains information about the purpose and goals of testing within the project. Additionally, the test plan identifies the strategies to be used to implement and execute testing, and the resources needed. The purpose of the test plan is to communicate the intent of the testing activities. It is critical that this document be created as…

Read More Read More

Guidelines: Software Architecture Document

The references section presents external documents which provide background information important to an understanding of the architecture of the system. If there are a larger number of references, structure the section in subsections: external documents internal documents government documents non-government documents etc. Architectural Goals and Constraints The architecture will be formed by considering: functional requirements, captured in the Use-Case Model,…

Read More Read More

Workflow Detail: Monitor & Control Project

 Disciplines >  Project Management >  Workflow >  Control Project Purpose How to Staff Work Guidelines   This workflow detail captures the daily, continuing, work of the Project Manager, covering: dealing with change requests that have been sanctioned by the Change Control Manager, and scheduling these for the current or future iterations; continuously monitoring the project in terms of active risks and objective measurements…

Read More Read More

Guidelines: Design Model

Design Model The Artifact: Design Model is an object model describing the realization of use cases, and serves as an abstraction of the implementation model and its source code. Artifact: Analysis Classes represent roles played by instances of design elements; these roles may be fulfilled by one or more design model elements. In addition, a single design element may fulfill…

Read More Read More

Workflow Detail: Plan for Next Iteration

Purpose How to Staff Work Guidelines   The purpose of this workflow detail is to create an Iteration Plan, which is a fine-grained plan to guide the next iteration. The Iteration Plan should be reviewed by the customer and other stakeholders. This review also gives the customer visibility of the project’s expectations of customer participation and resources—particularly if the iteration…

Read More Read More

Workflow Detail: Execute Tests in Integration Test Stage

Purpose How to Staff Work Guidelines   The purpose of the Integration Test Stage is to ensure that the assembly of the system’s components collaborate as intended, as well as that the increment has the right behavior. The system integrator compiles and links the system in increments. Each increment needs to go through testing of the functionality that has been…

Read More Read More

Artifact: Boundary Class

Input to Activities: The Word template can be bought through a template package. Case studies and reports are freely available in the table below. Word Template Case Study Report — — Purpose A boundary class represents an interface between the system and some entity outside the system: a person or another system. Its role is to mediate the exchange of…

Read More Read More

Guidelines: Iteration Plan

Iteration Plan A time-sequenced set of activities and tasks, with assigned resources, containing task dependencies, for the iteration; a fine-grained plan. In Inception, the top risks are often either business risks or technical risks. The dominant business risk early on is typically ensuring project funding. Thus, a proof of concept prototype is often the result of the inception phase. The…

Read More Read More